Trackwatch

A DIGEST OF THE MAIN CHANGES ON NETWORK RAIL, LONDON UNDERGROUND AND NORTHERN IRELAND RAILWAYS INFRASTRUCTURE DURING DECEMBER 2018 (ACTUALLY UP TO 2 JANUARY 2019); COMPILED BY MARTYN BRAILSFORD OF THE BRANCH LINE SOCIETY (WWW.BRANCHLINE.UK). BOOK FOUR REFERENCES REFER TO THE NEW FOURTH EDITION.

December, as always, is a busy time; this year saw a large number of platform extension works take place for either the IET Programme or the Great North Rail Project. Both York and Manchester ROCs took on further responsibilities and electrification continued in Scotland and to a smaller extent on the Western. However, only two significant trackwork enhancement projects took place, those at Wellingborough and Trimley.

ANGLIA

Ipswich – Felixstowe (2:9A) In connection with Felixstowe branch capacity improvements a number of new turnouts have been installed (but not yet commissioned) in the Trimley area, on the Felixstowe Single. These are (1) a facing point in the down direction at 81M 56ch – this will become Gun Lane Junction; (2) a facing point in the down direction at 81M 48ch; (3) a trailing point in the down direction at 82M 71ch with a corresponding facing point in the down direction at 82M 66ch in the North Quay Branch.

EAST MIDLANDS

Want to read more?

This is a premium article and requires an active subscription.

Existing subscriber? Sign in now

I have a subscription but need to register on site…

You will need your print Customer ID ready to set up an account, you'll find this on your welcome email and cover sheet delivered with each print magazine.

Register now

No subscription?

Pick one of our introductory offers