Trackwatch

A digest of the main changes on Network Rail, London Underground and Northern Ireland Railways infrastructure during April 2019; compiled by Martyn Brailsford of the Branch Line Society (www.branchline.uk)

ANGLIA

Between Brundall Junction and Reedham Swing Bridge (2:8) Interim signalling alterations have taken place on this section of line with Cantley signal box (10M 04ch) being downgraded to a gate box and Reedham Junction signal box (12M 28ch) being abolished. Telephone communications from level crossings to Cantley have been transferred to Brundall Junction. Basin (UWC) at 11M 09ch now communicates with Reedham Swing Bridge signal box. Church Dam (UWC) 12M 76ch and Church Lane (UWC) at 13M 35ch on the Berney Arms line now communicate with Yarmouth signal box. The fairly recently relaid pointwork at Reedham Junction remains clipped and locked for running to and from Lowestoft only until further notice and therefore there remains no service on the line between Reedham and Great Yarmouth via Berney Arms. At Brundall the trailing crossover by the station has been removed. Brundall Junction (5M 73ch) has been remodelled and now consists of a trailing crossover and a sing…

Want to read more?

This is a premium article and requires an active subscription.

Existing subscriber? Sign in now

I have a subscription but need to register on site…

You will need your print Customer ID ready to set up an account, you'll find this on your welcome email and cover sheet delivered with each print magazine.

Register now

No subscription?

Pick one of our introductory offers